The roof is being installed over the future office.
- The Palace-Castel Rigone

- Feb 19, 2019
- 1 min read
The stainless steel pipe is for ventilation of the ground floor fireplace and the kitchen. It's too bad that regulations will not let us build a roof top terrace!








Comments