top of page
Logo_The_Palace_JPEG.jpg
  • Facebook Icon
  • Instagram Icon
  • YouTube Icon

Our Logbook

Search

The three arches on the third floor have been completely rebuilt.

The existing arches were demolished and completely rebuilt. An adjustable metal frame is used to ensure the three arches are the same. The frame can be still in place in the last arch.

ree

 
 
 

Comments


...WORKS IN PROGRESS...

bottom of page